COMPLETED PROJECS
- Details
- Category: Completed Projects
The VARD NB966 vessel was designed exclusively for Edda Wind, offering exceptional flexibility and operability for offshore wind farm operations worldwide. The vessel is prepared for zero-emission operations, based on a Liquid Organic Hydrogen Carrier (LOHC) concept, and is also methanol-ready, supporting future-proof sustainable solutions.
Scope of work:
Wall and ceiling insulation, sheet metal linings
- Details
- Category: Completed Projects
The Prysmian Alessandro Volta (NB970) is the largest vessel ever launched by VARD, with a length of 192.8 meters. Built on the VARD 9 18 design, this next-generation cable-laying vessel is engineered for the most demanding offshore power cable installation projects.
Scope of work:
Wall and ceiling insulation, sheet metal linings
- Details
- Category: Completed Projects
The VARD NB984 vessel was developed to support efficient, sustainable fishing operations, combining a modern, purpose-driven design with high levels of operational reliability. The vessel is engineered to meet demanding offshore conditions while optimizing performance, safety, and long-term efficiency for professional fishing activities.
Scope of work:
Wall and ceiling insulation, pipe insulation, floating floors, sheet metal linings
- Details
- Category: Completed Projects
Part of the VARD 4 22 design series, NB976 was specifically tailored to support North Star’s offshore wind operations. The vessel offers high operational efficiency, enhanced onboard comfort, and exceptional flexibility, enabling safe and reliable performance while supporting the continued growth of the offshore renewable energy sector.
Scope of work:
Wall and ceiling insulation, pipe insulation, floating floors, sheet metal linings
- Details
- Category: Completed Projects
NB982 is the fourth Commissioning Service Operation Vessel (CSOV) hull constructed in Brăila for Norwind Offshore. Developed under the VARD 4 19 design concept, the vessel measures 85 meters in length and 19.5 meters in width. It features modern single-cabin accommodation for up to 87 personnel, ensuring high standards of comfort and functionality. The design emphasizes efficiency, safety, and operational flexibility, making the vessel well suited for demanding offshore wind and renewable energy operations.
EL
EN